Commercial

Pinnacle Marina Tower

San Diego, CA

The project covered the design of an anchorage system for seismic and wind bracing of a new cooling tower to replace the existing cooling tower located at the roof level. Steel beams spanning between and anchored to existing concrete walls were used to form a frame to brace the top of the cooling tower.

La Jolla Center

Regents